Mercedes-Benz Stockport

Vision Specialist Contracting visited the site and carried out a number of flood tests before designing a solution for our client to approve. This consisted of the supply and installation of Gully Pots to the First Floor, including all enabling works, waterproofing and re-coating of all surrounding parking bays. On the Ground Floor due to the deck buildup we selected a low profile aco drain, including all enabling works, waterproofing and re-coating of all surrounding parking bays. The system’s ability to be applied in cold temperatures was another significant benefit, as the project would take place over some winter months.

The application

After design approval and PI approval Vision Specialist Contracting Ltd. applied the system swiftly to each of the decks, ensuring the programme of works stayed on schedule, avoiding disruption to the client, achieving a lightweight and effective, long lasting waterproofing and surfacing solution.

The designed systems were installed as per their manufactured guidelines under a close QA inspection by our client.

All phases were closely managed to ensure minimum disruption and minimal time for a bay to be out of use.

Summary

Vision Specialist Contracting Ltd. have designed and installed a solution to our client’s problem, removing the issues caused by standing water to the new vehicles being stored in these areas.

Inspired by our work?

Please fill out the form, so we can learn more about you and your needs.