The strategic selection and installation of Sentinel EMR Type 6 Bridge Expansion Joints proved to be the ideal solution for the Wandsworth Bridge’s refurbishment needs. The joints’ design facilitated a swift installation process, allowing Vision Specialist Contracting to meet the pressing deadline. As a result, the bridge was equipped with a robust expansion joint system capable of enduring the demands of constant traffic and environmental factors.

 

The collaboration between Vision Specialist Contracting and FM Conway, coupled with the use of high-quality materials and an efficient installation method, resulted in the bridge reopening to the public on schedule. The project’s success demonstrated Vision’s ability to deliver effective solutions under pressure and solidified their reputation as a contractor capable of meeting complex challenges with precision and promptness. The Wandsworth Bridge refurbishment stands as a testament to the company’s commitment to excellence.